Blaabjerg Biogas is one of the oldest biogas facilities in Denmark, and was inaugurated in 1996. The company is a cooperative with limited liability, and is owned by 35 members of which most are local farmers. The facility is led by a board, chosen by the members. The facility has been modernized and expanded in 2009, 2011, 2014 and again in 2020, such that today is both economically sustainable and state-of-the art.
The facility utilizes livestock manures as the main feedstock for biogas production, which with the last modernization now is sent both to two different local CHP users as well as upgraded and injected to grid.
Blaabjerg Biogas has gone through various expansions over the years:
- Expansion (2019 & 2020)
- Renovation / Expansion (2015 & 2016)
- Expansion (2011)
- Expansion (2009)
- Green Field (1996)
Capacity:
1000 t/day, cattle/pig slurries, deep bedding and industrial wastes
Biogas production: 22 million Nm3/year biogas (7.5 million m3 used for CHP)
Products:
8.5 million m3/year bio-natural gas + heat + organic fertilizer
Digesters:
2 x 2800 m3 + 3 x 5000 m3+ 9200 m3
Renew services:
Environmental impact assessment and approval + Design + Procurement + Inspection during construction
Capacity:
750t/day cattle/pig slurries, deep bedding and industrial wastes
Biogas production:
9 million Nm3/year biogas
Products:
3.3 MW power + heat + organic fertilizer
Digesters:
2 x 2800 m3 + 3 x 5000 m3
Renew services:
Design + Procurement + Inspection during construction
Capacity:
500 t/day cattle/pig slurries, deep bedding and industrial wastes
Biogas production:
7 million Nm3/year biogas
Products:
2.8 MW power + heat + organic fertilizer
Digesters:
2 x 2500 m3 + 2 x 5000 m3
Renew services:
Environmental impact assessment + Design + Procurement + Inspection during construction
Capacity:
500 t/day cattle/pig slurries, deep bedding and industrial wastes
Biogas production:
4 million Nm3/year biogas
Products:
1.4 MW power + heat + organic fertilizer
Digesters:
2x2500m3+5000m3
Renew services:
Design + Procurement + Inspection during construction
Capacity:
350t/day cattle/pigs lurries, deep bedding and industrial wastes
Biogasproduction:
3 million Nm3/year biogas
Products:
1.4MW power + heat + organic fertilizer
Digesters:
2x2500m3
Renew services:
Owner’s advicer + Inspection during construction